Location:
AIA Seattle
Seattle, WA
Speaker:
Daniel Swaab, Ryan Rideout
Date & Time:
10.29.2026 | 2:00pm - 3:00pm
Join Mithun principal Dan Swaab and associate Ryan Rideout for “Mass Timber Committee: Bush Middle School Construction Tour,” a guided on-site session and in-depth look at the new building in construction for Bush Middle School in Seattle. The three-story, 24,000-square-foot structure uses CLT panels and glulam framing to create a sustainable, biophilic environment that will support students and faculty, with spaces including classrooms, offices, dining commons and an administrative wing. Attendees will tour the site with members of the project team, who will share strategies for successful, code-compliant mass timber projects, including insight into design, detailing and construction techniques utilized throughout the building.
Mithun will co-present with DCI Engineers and Venture Construction.
Date Posted: 10.29.2026